A Last War hero needs 15,287,025,400 EXP to go from level 1 to 175, and the last 25 levels take 10,050,000,000 of it, about 66%. Stars follow the same curve on a smaller scale: 975 shards take a hero from 0 to 5 stars, and 800 of them, about 82%, are spent on the fourth and fifth stars.
How EXP grows with level
Early levels cost almost nothing. Level 2 takes 100 EXP and each of the next twenty levels adds another 100, so level 22 costs 2,100 and the first 25 levels together cost 31,300 EXP. After that the price rises faster than the level does. The biggest jumps come early, with levels 26 to 50 costing about 59 times the first band, and from level 101 on each 25-level band costs 2.2 to 3.1 times the one before:
| Levels | EXP for those levels | EXP to here |
|---|---|---|
| 1 to 25 | 31,300 | 31,300 |
| 26 to 50 | 1,854,100 | 1,885,400 |
| 51 to 75 | 75,940,000 | 77,825,400 |
| 76 to 100 | 482,200,000 | 560,025,400 |
| 101 to 125 | 1,475,000,000 | 2,035,025,400 |
| 126 to 150 | 3,202,000,000 | 5,237,025,400 |
| 151 to 175 | 10,050,000,000 | 15,287,025,400 |
From level 100 the steps settle into straight lines. Each level up to 132 costs 2,000,000 more than the one before, from 33,000,000 at level 100 up to 97,000,000. From 134 to 150 the step is 5,000,000, ending at 185,000,000 for level 150. Past that the slope steepens twice: 15,000,000 a level from 200,000,000 at level 151 to 410,000,000 at 165, then 25,000,000 a level to 660,000,000 for level 175.
That last step on its own is worth almost as much as levels 1 to 103 combined, which total 671,025,400 EXP. A hero at level 150 has spent 5,237,025,400, roughly a third of the full climb; a hero at level 100 has spent under 4%.
The curve is not perfectly smooth in the middle. A few neighbouring levels share the same price: levels 80 and 81 both cost 13,000,000, 82 and 83 both cost 14,000,000, and 86 and 87 both cost 17,000,000.
Base Expansion gates the last 25 levels
Levels 1 to 150 have no research requirement in the level table. Every level from 151 to 175 lists Base Expansion as its required research, so it is the single unlock standing between a level 150 hero and the top band. The hero level cap also rises with your Headquarters, 5 levels per HQ level, which is why the top band arrives together with the HQ 31 to 35 climb in the HQ upgrade cost guide.
| Level | EXP for this level | EXP to here | Research needed |
|---|---|---|---|
| 2 | 100 | 100 | — |
| 3 | 200 | 300 | — |
| 4 | 300 | 600 | — |
| 5 | 400 | 1,000 | — |
| 6 | 500 | 1,500 | — |
| 7 | 600 | 2,100 | — |
| 8 | 700 | 2,800 | — |
| 9 | 800 | 3,600 | — |
| 10 | 900 | 4,500 | — |
| 11 | 1,000 | 5,500 | — |
| 12 | 1,100 | 6,600 | — |
| 13 | 1,200 | 7,800 | — |
| 14 | 1,300 | 9,100 | — |
| 15 | 1,400 | 10,500 | — |
| 16 | 1,500 | 12,000 | — |
| 17 | 1,600 | 13,600 | — |
| 18 | 1,700 | 15,300 | — |
| 19 | 1,800 | 17,100 | — |
| 20 | 1,900 | 19,000 | — |
| 21 | 2,000 | 21,000 | — |
| 22 | 2,100 | 23,100 | — |
| 23 | 2,300 | 25,400 | — |
| 24 | 2,700 | 28,100 | — |
| 25 | 3,200 | 31,300 | — |
| 26 | 3,900 | 35,200 | — |
| 27 | 4,600 | 39,800 | — |
| 28 | 5,500 | 45,300 | — |
| 29 | 6,600 | 51,900 | — |
| 30 | 8,000 | 59,900 | — |
| 31 | 9,500 | 69,400 | — |
| 32 | 12,000 | 81,400 | — |
| 33 | 14,000 | 95,400 | — |
| 34 | 17,000 | 112,400 | — |
| 35 | 20,000 | 132,400 | — |
| 36 | 24,000 | 156,400 | — |
| 37 | 29,000 | 185,400 | — |
| 38 | 35,000 | 220,400 | — |
| 39 | 41,000 | 261,400 | — |
| 40 | 49,000 | 310,400 | — |
| 41 | 59,000 | 369,400 | — |
| 42 | 71,000 | 440,400 | — |
| 43 | 85,000 | 525,400 | — |
| 44 | 110,000 | 635,400 | — |
| 45 | 130,000 | 765,400 | — |
| 46 | 150,000 | 915,400 | — |
| 47 | 180,000 | 1,095,400 | — |
| 48 | 220,000 | 1,315,400 | — |
| 49 | 260,000 | 1,575,400 | — |
| 50 | 310,000 | 1,885,400 | — |
| 51 | 370,000 | 2,255,400 | — |
| 52 | 440,000 | 2,695,400 | — |
| 53 | 530,000 | 3,225,400 | — |
| 54 | 630,000 | 3,855,400 | — |
| 55 | 760,000 | 4,615,400 | — |
| 56 | 910,000 | 5,525,400 | — |
| 57 | 1,100,000 | 6,625,400 | — |
| 58 | 1,400,000 | 8,025,400 | — |
| 59 | 1,600,000 | 9,625,400 | — |
| 60 | 1,900,000 | 11,525,400 | — |
| 61 | 2,100,000 | 13,625,400 | — |
| 62 | 2,300,000 | 15,925,400 | — |
| 63 | 2,500,000 | 18,425,400 | — |
| 64 | 2,800,000 | 21,225,400 | — |
| 65 | 3,100,000 | 24,325,400 | — |
| 66 | 3,400,000 | 27,725,400 | — |
| 67 | 3,700,000 | 31,425,400 | — |
| 68 | 4,100,000 | 35,525,400 | — |
| 69 | 4,500,000 | 40,025,400 | — |
| 70 | 4,900,000 | 44,925,400 | — |
| 71 | 5,400,000 | 50,325,400 | — |
| 72 | 5,900,000 | 56,225,400 | — |
| 73 | 6,500,000 | 62,725,400 | — |
| 74 | 7,200,000 | 69,925,400 | — |
| 75 | 7,900,000 | 77,825,400 | — |
| 76 | 8,700,000 | 86,525,400 | — |
| 77 | 9,500,000 | 96,025,400 | — |
| 78 | 11,000,000 | 107,025,400 | — |
| 79 | 12,000,000 | 119,025,400 | — |
| 80 | 13,000,000 | 132,025,400 | — |
| 81 | 13,000,000 | 145,025,400 | — |
| 82 | 14,000,000 | 159,025,400 | — |
| 83 | 14,000,000 | 173,025,400 | — |
| 84 | 15,000,000 | 188,025,400 | — |
| 85 | 16,000,000 | 204,025,400 | — |
| 86 | 17,000,000 | 221,025,400 | — |
| 87 | 17,000,000 | 238,025,400 | — |
| 88 | 18,000,000 | 256,025,400 | — |
| 89 | 19,000,000 | 275,025,400 | — |
| 90 | 20,000,000 | 295,025,400 | — |
| 91 | 21,000,000 | 316,025,400 | — |
| 92 | 22,000,000 | 338,025,400 | — |
| 93 | 23,000,000 | 361,025,400 | — |
| 94 | 24,000,000 | 385,025,400 | — |
| 95 | 26,000,000 | 411,025,400 | — |
| 96 | 27,000,000 | 438,025,400 | — |
| 97 | 28,000,000 | 466,025,400 | — |
| 98 | 30,000,000 | 496,025,400 | — |
| 99 | 31,000,000 | 527,025,400 | — |
| 100 | 33,000,000 | 560,025,400 | — |
| 101 | 35,000,000 | 595,025,400 | — |
| 102 | 37,000,000 | 632,025,400 | — |
| 103 | 39,000,000 | 671,025,400 | — |
| 104 | 41,000,000 | 712,025,400 | — |
| 105 | 43,000,000 | 755,025,400 | — |
| 106 | 45,000,000 | 800,025,400 | — |
| 107 | 47,000,000 | 847,025,400 | — |
| 108 | 49,000,000 | 896,025,400 | — |
| 109 | 51,000,000 | 947,025,400 | — |
| 110 | 53,000,000 | 1,000,025,400 | — |
| 111 | 55,000,000 | 1,055,025,400 | — |
| 112 | 57,000,000 | 1,112,025,400 | — |
| 113 | 59,000,000 | 1,171,025,400 | — |
| 114 | 61,000,000 | 1,232,025,400 | — |
| 115 | 63,000,000 | 1,295,025,400 | — |
| 116 | 65,000,000 | 1,360,025,400 | — |
| 117 | 67,000,000 | 1,427,025,400 | — |
| 118 | 69,000,000 | 1,496,025,400 | — |
| 119 | 71,000,000 | 1,567,025,400 | — |
| 120 | 73,000,000 | 1,640,025,400 | — |
| 121 | 75,000,000 | 1,715,025,400 | — |
| 122 | 77,000,000 | 1,792,025,400 | — |
| 123 | 79,000,000 | 1,871,025,400 | — |
| 124 | 81,000,000 | 1,952,025,400 | — |
| 125 | 83,000,000 | 2,035,025,400 | — |
| 126 | 85,000,000 | 2,120,025,400 | — |
| 127 | 87,000,000 | 2,207,025,400 | — |
| 128 | 89,000,000 | 2,296,025,400 | — |
| 129 | 91,000,000 | 2,387,025,400 | — |
| 130 | 93,000,000 | 2,480,025,400 | — |
| 131 | 95,000,000 | 2,575,025,400 | — |
| 132 | 97,000,000 | 2,672,025,400 | — |
| 133 | 100,000,000 | 2,772,025,400 | — |
| 134 | 105,000,000 | 2,877,025,400 | — |
| 135 | 110,000,000 | 2,987,025,400 | — |
| 136 | 115,000,000 | 3,102,025,400 | — |
| 137 | 120,000,000 | 3,222,025,400 | — |
| 138 | 125,000,000 | 3,347,025,400 | — |
| 139 | 130,000,000 | 3,477,025,400 | — |
| 140 | 135,000,000 | 3,612,025,400 | — |
| 141 | 140,000,000 | 3,752,025,400 | — |
| 142 | 145,000,000 | 3,897,025,400 | — |
| 143 | 150,000,000 | 4,047,025,400 | — |
| 144 | 155,000,000 | 4,202,025,400 | — |
| 145 | 160,000,000 | 4,362,025,400 | — |
| 146 | 165,000,000 | 4,527,025,400 | — |
| 147 | 170,000,000 | 4,697,025,400 | — |
| 148 | 175,000,000 | 4,872,025,400 | — |
| 149 | 180,000,000 | 5,052,025,400 | — |
| 150 | 185,000,000 | 5,237,025,400 | — |
| 151 | 200,000,000 | 5,437,025,400 | Base Expansion |
| 152 | 215,000,000 | 5,652,025,400 | Base Expansion |
| 153 | 230,000,000 | 5,882,025,400 | Base Expansion |
| 154 | 245,000,000 | 6,127,025,400 | Base Expansion |
| 155 | 260,000,000 | 6,387,025,400 | Base Expansion |
| 156 | 275,000,000 | 6,662,025,400 | Base Expansion |
| 157 | 290,000,000 | 6,952,025,400 | Base Expansion |
| 158 | 305,000,000 | 7,257,025,400 | Base Expansion |
| 159 | 320,000,000 | 7,577,025,400 | Base Expansion |
| 160 | 335,000,000 | 7,912,025,400 | Base Expansion |
| 161 | 350,000,000 | 8,262,025,400 | Base Expansion |
| 162 | 365,000,000 | 8,627,025,400 | Base Expansion |
| 163 | 380,000,000 | 9,007,025,400 | Base Expansion |
| 164 | 395,000,000 | 9,402,025,400 | Base Expansion |
| 165 | 410,000,000 | 9,812,025,400 | Base Expansion |
| 166 | 435,000,000 | 10,247,025,400 | Base Expansion |
| 167 | 460,000,000 | 10,707,025,400 | Base Expansion |
| 168 | 485,000,000 | 11,192,025,400 | Base Expansion |
| 169 | 510,000,000 | 11,702,025,400 | Base Expansion |
| 170 | 535,000,000 | 12,237,025,400 | Base Expansion |
| 171 | 560,000,000 | 12,797,025,400 | Base Expansion |
| 172 | 585,000,000 | 13,382,025,400 | Base Expansion |
| 173 | 610,000,000 | 13,992,025,400 | Base Expansion |
| 174 | 635,000,000 | 14,627,025,400 | Base Expansion |
| 175 | 660,000,000 | 15,287,025,400 | Base Expansion |
Star and tier costs
Each star is split into five steps: four tiers and then the star itself, so going from 1 Star to 2 Stars passes Star 1 Tier 1 to Tier 4 on the way. All five steps of a star cost the same number of shards, and that price changes only when the next star begins:
| Stars | Shards per step | Shards for the star | Shards to here | Promoted hero, to here |
|---|---|---|---|---|
| 0 to 1 | 5 | 25 | 25 | 50 |
| 1 to 2 | 10 | 50 | 75 | 150 |
| 2 to 3 | 20 | 100 | 175 | 350 |
| 3 to 4 | 60 | 300 | 475 | 950 |
| 4 to 5 | 100 | 500 | 975 | 1,950 |
The jump at the third star is the sharpest: a step costs 20 shards up to 3 Stars and 60 after it. A hero at 3 Stars has used 175 shards, under a fifth of the 975 it needs for 5 Stars.
| Rank reached | Shards | Shards to here | Promoted hero shards | Promoted hero to here |
|---|---|---|---|---|
| Star 0 Tier 1 | 5 | 5 | 10 | 10 |
| Star 0 Tier 2 | 5 | 10 | 10 | 20 |
| Star 0 Tier 3 | 5 | 15 | 10 | 30 |
| Star 0 Tier 4 | 5 | 20 | 10 | 40 |
| 1 Star | 5 | 25 | 10 | 50 |
| Star 1 Tier 1 | 10 | 35 | 20 | 70 |
| Star 1 Tier 2 | 10 | 45 | 20 | 90 |
| Star 1 Tier 3 | 10 | 55 | 20 | 110 |
| Star 1 Tier 4 | 10 | 65 | 20 | 130 |
| 2 Stars | 10 | 75 | 20 | 150 |
| Star 2 Tier 1 | 20 | 95 | 40 | 190 |
| Star 2 Tier 2 | 20 | 115 | 40 | 230 |
| Star 2 Tier 3 | 20 | 135 | 40 | 270 |
| Star 2 Tier 4 | 20 | 155 | 40 | 310 |
| 3 Stars | 20 | 175 | 40 | 350 |
| Star 3 Tier 1 | 60 | 235 | 120 | 470 |
| Star 3 Tier 2 | 60 | 295 | 120 | 590 |
| Star 3 Tier 3 | 60 | 355 | 120 | 710 |
| Star 3 Tier 4 | 60 | 415 | 120 | 830 |
| 4 Stars | 60 | 475 | 120 | 950 |
| Star 4 Tier 1 | 100 | 575 | 200 | 1,150 |
| Star 4 Tier 2 | 100 | 675 | 200 | 1,350 |
| Star 4 Tier 3 | 100 | 775 | 200 | 1,550 |
| Star 4 Tier 4 | 100 | 875 | 200 | 1,750 |
| 5 Stars | 100 | 975 | 200 | 1,950 |
What each star adds
Every step also raises the hero's HP, Attack and Defense bonus, by the same amount for each step within a star. At 5 Stars the bonus reaches 147,592 HP, 3,514.25 Attack and 702.9 Defense. The stat gain per step grows much more slowly than the shard price. A step in the first star adds 3,577.99 HP for 5 shards; a step in the fifth star adds 8,944.97 HP for 100. The first star brings 17,889.95 HP for 25 shards, while the fifth brings 44,724.85 HP for 500, so each shard buys about an eighth as much HP at the top.
| Rank reached | HP bonus | Attack bonus | Defense bonus |
|---|---|---|---|
| Star 0 Tier 1 | 3,577.99 | 85.20 | 17.04 |
| Star 0 Tier 2 | 7,155.98 | 170.40 | 34.08 |
| Star 0 Tier 3 | 10,733.97 | 255.60 | 51.12 |
| Star 0 Tier 4 | 14,311.96 | 340.80 | 68.16 |
| 1 Star | 17,889.95 | 426.00 | 85.20 |
| Star 1 Tier 1 | 22,362.44 | 532.49 | 106.50 |
| Star 1 Tier 2 | 26,834.93 | 638.98 | 127.80 |
| Star 1 Tier 3 | 31,307.42 | 745.47 | 149.10 |
| Star 1 Tier 4 | 35,779.91 | 851.96 | 170.40 |
| 2 Stars | 40,252.40 | 958.45 | 191.70 |
| Star 2 Tier 1 | 45,619.38 | 1,086.24 | 217.26 |
| Star 2 Tier 2 | 50,986.36 | 1,214.03 | 242.82 |
| Star 2 Tier 3 | 56,353.34 | 1,341.82 | 268.38 |
| Star 2 Tier 4 | 61,720.32 | 1,469.61 | 293.94 |
| 3 Stars | 67,087.30 | 1,597.40 | 319.50 |
| Star 3 Tier 1 | 74,243.27 | 1,767.79 | 353.58 |
| Star 3 Tier 2 | 81,399.24 | 1,938.18 | 387.66 |
| Star 3 Tier 3 | 88,555.21 | 2,108.57 | 421.74 |
| Star 3 Tier 4 | 95,711.18 | 2,278.96 | 455.82 |
| 4 Stars | 102,867.15 | 2,449.35 | 489.90 |
| Star 4 Tier 1 | 111,812.12 | 2,662.33 | 532.50 |
| Star 4 Tier 2 | 120,757.09 | 2,875.31 | 575.10 |
| Star 4 Tier 3 | 129,702.06 | 3,088.29 | 617.70 |
| Star 4 Tier 4 | 138,647.03 | 3,301.27 | 660.30 |
| 5 Stars | 147,592.00 | 3,514.25 | 702.90 |
The promoted heroes
Six heroes start as SSR and can be promoted to UR: Mason, Violet and Scarlett on Tank, Sarah on Aircraft, and Venom and Braz on Missile. Their star table charges exactly twice the regular price at every step, 10 shards a step for the first star up to 200 for the fifth, so the full climb to 5 Stars costs them 1,950 shards. The stretch from 3 Stars to 5 Stars alone is 1,600 shards on the promoted track.
| Hero | Troop type | Rarity |
|---|---|---|
| Mason | Tank | UR |
| Violet | Tank | UR |
| Scarlett | Tank | UR |
| Sarah | Aircraft | UR |
| Venom | Missile | UR |
| Braz | Missile | UR |
Putting it together
Maxing one regular hero takes 15,287,025,400 EXP and 975 shards; a promoted hero needs the same EXP and 1,950 shards. Both costs pile up at the end. Levels to 100 and stars to 3 are cheap enough to spread across a whole squad, while levels past 150 and the fourth and fifth stars hold most of the bill. Those are the levels and stars to save for the heroes your main squad is built around.